Imagine a small flight academy, invented for this story, with eight training aircraft, a handful of instructors and one scheduling system that tells everyone who flies what and when. The ops lead is the sort of person who keeps a paper checklist in his shirt pocket even though everything is digital. One Thursday morning he gets a call that makes him glad of the habit: the scheduling system has gone dark, and the first student briefing is in forty minutes. What follows is a friendly walk through how a team like this might handle it, and what the discipline called DisasterRecoveryOps teaches about the decisions involved.
The morning the schedule disappeared
The scheduling tool runs in a data centre far from the airfield, with a smaller standby copy kept in a second location. The academy had never switched over for real. There was a recovery document, written a year earlier, that said only: “fail over to the standby.” The ops lead reads it standing at the front desk and realises it answers none of his actual questions. Who is allowed to flip the switch? What happens to bookings made in the last ten minutes? Which instructors need to be told?
He does what most of us would do and calls two colleagues. They spend eleven minutes discussing it. Nothing has been broken further, but the clock keeps running.
What the Atlas says about those eleven minutes
Later that week the ops lead reads the Atlas entry on DisasterRecoveryOps, and one idea lands hard: the recovery clock includes the decision. The entry’s example drill adds six minutes of detecting and 25 minutes of deciding to 33 minutes of technical work, for 64 minutes against a one-hour target. The discussion at the front desk was a small version of the same leak.
The entry’s remedy is to set a decision deadline ahead of time. You take your target, subtract your slowest recent practice run, and take off a margin. The ops lead works out the numbers for his academy: the first briefing at 8:00, a switch that takes about half an hour when rehearsed, and ten minutes of margin. That means the decision to move to the standby must be made by 7:20, without a committee.
Doing the switch in the right order
With a deadline in mind, the team plans the sequence. The Atlas describes the order used when moving to a standby: first stop the old system from accepting changes, then promote the standby’s data, then point users at it. It calls the first step fencing, and warns that fencing is often leakier than people think. Turning off one route to a system does not necessarily stop scheduled jobs, background workers or cached connections from still writing to it.
The ops lead’s cockpit habits help here. Pilots do not start the second engine before confirming the first is secured; they run items in a deliberate sequence and call each one out. He rewrites the recovery page as a numbered list with a name beside every line, and adds a line that says “confirm the old system is read-only before telling anyone the new one is live.”
If you enjoy that kind of procedural thinking applied to machines, our piece on how analytics can watch the health of aircraft engines follows a similar logic of watching signals and acting at set thresholds.
Where did the last ten minutes of bookings go?
Suppose the old system accepted bookings for ten minutes after the standby last received a copy. When the team moves over, those bookings are missing. The Atlas is direct about this: an emergency failover may drop changes still waiting to be replicated, while a planned switchover, made when both sides are healthy, can be arranged to drop nothing.
The entry recommends a three-part approach for reconciling the gap. First, preserve the old system’s data before anyone touches it, because automatic retention can expire a snapshot. Second, compare a restored copy against the new live system rather than working on production directly. Third, replay the missing records through the application itself, in a form that tolerates repetition, so that running it twice does not book a student into the same aircraft slot twice.
The academy’s team does a gentle human version. An instructor pulls last night’s paper-based flight board, compares it with the screen, and adds missing sessions one by one. Not elegant, but nobody is double-booked.
Every store counts
While rebuilding the plan, The ops lead notices that the schedule is not the only thing the academy needs. Instructor accounts, aircraft maintenance logs and student records live in separate places, each with its own copy schedule. The Atlas makes the relevant point: the real exposure for a service equals the worst lag of any store that service depends on. If the schedule is copied every minute but the maintenance log only nightly, the nightly figure is the one that counts when a dispatcher needs to know whether an aircraft is cleared.
He draws up a short table on a whiteboard, one row per store, with the last copy time beside each. It is the most useful thirty minutes of the whole exercise.
Practising until it is boring
The following month the academy runs a drill on a quiet Sunday. It takes 38 minutes, and the decision happens in three, because the deadline and the decision-maker are written on the front of the page. They time every step, including the argument over whether the standby has the right instructor accounts. It does not, and that is found and fixed on a Sunday rather than a Thursday.
The Atlas treats this rhythm as the point of the discipline. Its maturity ladder starts with objectives that are simply written down and climbs through a plan that passes basic checks to repeated drills inside the target, then to switchovers without console improvisation, and finally to routine switchovers in production. The ops lead decides that two consecutive successful drills is his bar before he allows himself to relax.
Keeping the way back on the plan
One more lesson arrives later. Having moved to the standby, the academy realises nobody has planned how to return. The Atlas notes that failing back is effectively a second migration, with its own sequence and its own risk, and that delaying the planning for it is a common mistake. The ops lead adds a final page to the document describing the return, including the same fencing step in reverse.
The same inspection mindset shows up in aircraft care, where each fix is followed by a check that the fix did not create another issue. Our article on visual inspection of airframes supported by image analysis touches on that habit of verifying after you repair.
What a small team can take from DisasterRecoveryOps
- Write down who decides, and by when, before anything goes wrong.
- Put the switch steps in order and name an owner for each.
- Assume the last few minutes of data may be missing, and know how you would find it.
- Rehearse on a calm day and time the deciding as well as the doing.
- Give the return trip the same care as the departure.
The ops lead still carries his paper checklist. These days one of the lines on it is the 7:20 deadline.